Architecture and Development homework help

Architecture and Development homework help

Overview

The CubeSat Project is a international collaboration of over 40 universities, high schools,

and private firms developing picosatellites containing scientific, private, and government

payloads. A CubeSat is a 10 cm cube with a mass of up to 1 kg. Developers benefit from

the sharing of information within the community. If you are planning to start a CubeSat

project, please contact California Polytechnic State University (Cal Poly). Visit the

CubeSat website at http://cubesat.calpoly.edu for more information.

Figure 1: Six CubeSats and their deployment systems.

The primary mission of the CubeSat Program is to provide access to space for small

payloads. The primary responsibility of Cal Poly as a launch coordinator is to ensure the

safety of the CubeSats and protect the launch vehicle (LV), primary payload, and other

CubeSats. CubeSat developers should play an active role in ensuring the safety and

success of CubeSat missions by implementing good engineering practice, testing, and

verification of their systems. Failures of CubeSats, the P-POD, or interface hardware can

damage the LV or a primary payload and put the entire CubeSat Program in jeopardy. As

part of the CubeSat Community, all participants have an obligation to ensure safe

operation of their systems and to meet the design and testing requirements outlined in this

document.

3

Figure 1: Cross section of the P-POD.

Figure 1: Poly Picosatellite Orbital Deployer

(P-POD)

P-POD Interface

The Poly Picosatellite Orbital Deployer (P-POD) is Cal Poly’s

standardized CubeSat deployment system. It is capable of carrying three

standard CubeSats and serves as the interface between the CubeSats and

LV. The P-POD is an aluminum, rectangular box with a door and a

spring mechanism. CubeSats slide along a series of rails during ejection

into orbit. CubeSats must be compatible with the P-POD to ensure safety

and success of the mission, by meeting the requirements outlined in

this document. Additional unforeseen compatibility issues will be

addressed as they arise.

General Responsibilities

1. CubeSats must not present any danger to neighboring CubeSats in the P-POD, the LV, or primary payloads:

• All parts must remain attached to the CubeSats during launch, ejection and operation. No additional space debris may be created.

• CubeSats must be designed to minimize jamming in the P-POD.

• Absolutely no pyrotechnics are allowed inside the CubeSat.

2. NASA approved materials should be used whenever possible to prevent contamination of other spacecraft during

integration, testing, and launch.

3. The newest revision of the CubeSat Specification is always the official version

• Developers are responsible for being aware of changes. • Changes will be made as infrequently as possible bearing launch provider

requirements or widespread safety concerns within the community.

• Cal Poly will send an update to the CubeSat mailing list upon any changes to the specification.

• CubeSats using an older version of the specification may be exempt from implementing changes to the specification on a case-by-case basis.

Cal Poly holds final approval of all CubeSat designs. Any deviations from the specification must be approved by Cal Poly launch personnel. Any CubeSat deemed a safety hazard by Cal Poly launch personnel may be pulled from the launch.

Dimensional and Mass Requirements

CubeSats are cube shaped picosatellites with a nominal length of 100 mm per side.

Dimensions and features are outlined in the CubeSat Specification Drawing (Attachment

1). General features of all CubeSats are:

• Each single CubeSat may not exceed 1 kg mass. • Center of mass must be within 2 cm of its geometric center. • Double and triple configurations are possible. In this case allowable mass 2 kg or

3 kg respectively. Only the dimensions in the Z axis change (227 mm for doubles

and 340.5 mm for triples). X and Y dimensions remain the same.

4

Figure 2: CubeSat isometric drawing.

Structural Requirements

The structure of the CubeSat must be strong enough to survive maximum loading defined in the testing requirements and cumulative loading of all required tests and launch. The CubeSat structure must be compatible with the P-POD.

• Rails must be smooth and edges must be rounded to a minimum radius of 1 mm.

• At least 75% (85.125 mm of a possible 113.5mm) of the rail must be in contact with the P-POD rails. 25% of the rails may be recessed and NO part of the rails may exceed the specification.

• All rails must be hard anodized to prevent cold-welding, reduce wear, and provide electrical isolation between the CubeSats and the P-POD.

• Separation springs must be included at designated contact points (Attachment 1). Spring plungers are recommended (McMaster-Carr P/N: 84985A76 available at

http://www.mcmaster.com). A custom separation system may be used, but must be approved by Cal Poly launch personnel.

• The use of Aluminum 7075 or 6061-T6 is suggested for the main structure. If other materials are used, the thermal expansion must be similar to that of Aluminum 7075-T73 (P-POD material) and approved by Cal Poly launch personnel.

• Deployables must be constrained by the CubeSat. The P-POD rails and walls are NOT to be used to constrain delpolyables.

Figure 3: Spring plunger.

5

Electrical Requirements

Electronic systems must be designed with the following safety features. • No electronics may be active during launch to prevent any electrical or RF

interference with the launch vehicle and primary payloads. CubeSats with

rechargeable batteries must be fully deactivated during launch or launch with

discharged batteries. • One deployment switch is required (two are recommended) for each CubeSat.

The deployment switch should be located at designated points (Attachment 1).

• Developers who wish to perform testing and battery charging after integration must provide ground support equipment (GSE) that connects to the CubeSat through designated data ports (Attachment 1).

• A remove before flight (RBF) pin is required to deactivate the CubeSats during integration outside the P-POD. The pin will be removed once the CubeSats are placed inside the P-POD. RBF pins must fit within the designated data ports (Attachment 1). RBF pins should not protrude more than 6.5 mm from the rails when fully inserted.

Operational Requirements

CubeSats must meet certain requirements pertaining to integration and operation to meet

legal obligations and ensure safety of other CubeSats.

• CubeSats with rechargeable batteries must have the capability to receive a transmitter shutdown command, as per FCC regulation.

• To allow adequate separation of CubeSats, antennas may be deployed 15 minutes after ejection from the P-POD (as detected by CubeSat deployment switches). Larger deployables such as booms and solar panels may be deployed 30 minutes after ejection from the P-POD.

• CubeSats may enter low power transmit mode (LPTM) 15 minutes after ejection from the P-POD. LPTM is defined as short, periodic beacons from the CubeSat. CubeSats may activate all primary transmitters, or enter high power transmit mode (HPTM) 30 minutes after ejection from the P-POD.

• Operators must obtain and provide documentation of proper licenses for use of frequencies. For amateur frequency use, this requires proof of frequency coordination by the International Amateur Radio Union (IARU). Applications can be found at www.iaru.org.

• Developers must obtain and provide documentation of approval of an orbital debris mitigation plan from the Federal Communications Commission (FCC). Contact Robert Nelson at rnelson@fcc.org

• Cal Poly will conduct a minimum of one fit check in which developer hardware will be inspected and integrated into the P-POD. A final fit check will be

conducted prior to launch. The CubeSat Acceptance Checklist (CAC) will be

used to verify compliance of the specification (Attachment 2). Additionally, periodic teleconferences, videoconferences, and progress reports may be required.

6

Testing Requirements

Testing must be performed to meet all launch provider requirements as well as any

additional testing requirements deemed necessary to ensure the safety of the CubeSats

and the P-POD. All flight hardware will undergo qualification and acceptance testing.

The P-PODs will be tested in a similar fashion to ensure the safety and workmanship

before integration with CubeSats. At the very minimum, all CubeSats will undergo the

following tests.

• Random vibration testing at a level higher than the published launch vehicle envelope outlined in the MTP.

• Thermal vacuum bakeout to ensure proper outgassing of components. The test cycle and duration will be outlined in the MTP.

• Visual inspection of the CubeSat and measurement of critical areas as per the CubeSat Acceptance Checklist (CAC).

Qualification

All CubeSats must survive qualification testing as outlined in the Mission Test Plan

(MTP) for their specific launch. The MTP can be found on the CubeSat website.

Qualification testing will be performed at above launch levels at developer facilities. In

some circumstances, Cal Poly can assist developers in finding testing facilities or provide

testing for the developers. A fee may be associated with any tests performed by Cal Poly.

CubeSats must NOT be disassembled or modified after qualification testing. Additional

testing will be required if modifications or changes are made to the CubeSats after

qualification.

Acceptance

After delivery and integration of the CubeSats, additional testing will be performed with

the integrated system. This test assures proper integration of the CubeSats into the P-

POD. Additionally, any unknown, harmful interactions between CubeSats may be

discovered during acceptance testing. Cal Poly will coordinate and perform acceptance

testing. No additional cost is associated with acceptance testing. After acceptance

testing, developers may perform diagnostics through the designated P-POD diagnostic

ports, and visual inspection of the system will be performed by Cal Poly launch

personnel. The P-PODs WILL NOT be deintegrated at this point. If a CubeSat failure is

discovered, a decision to deintegrate the P-POD will be made by the developers in that P-

POD and Cal Poly based on safety concerns. The developer is responsible for any

additional testing required due to corrective modifications to deintegrated CubeSats.

Contacts Cal Poly, San Luis Obispo Stanford University Prof. Jordi Puig-Suari Prof. Bob Twiggs, Director Aerospace Engineering Dept. Space Systems Development Lab. (SSDL) (805) 756-5087 Dept. of Aeronautics and Astronautics (805) 756-2376 fax (650) 723-8651 jpuigsua@calpoly.edu (650) 723-1685 fax

btwiggs@leland.stanford.edu Student Contacts:

Simon Lee stlee@calpoly.edu Armen Toorian

atoorian@calpoly.edu

– No external components other than the rails may touch the inside of the P-POD.

– Must incorporate a Remove Before Flight pin OR launch with batteries fully discharged.

– Components on shaded sides may not extend more than 6.5 mm normal to the surface.

– Rails must be either hard anodized OR made of a material other than aluminum.

– Separation Springs can be found at McMaster Carr (P/N: 84985A76)

– At least one (1) deployment switch must be incorporated on all CubeSats.

– CubeSats cannot weigh more than 1 kg.

– Center of gravity must be less than 2 cm from the geometric center.

Cubesat Acceptance Checklist

Revision Date: April 4, 2004 Author: Armen Toorian This document is intended to be used concurrently with the Cubesat Integration Procedure (CIP)

List Item Actual Required

Mass g1000!

Remove Before Flight Protrudes

Spring Plungers Functional

Rails Anodized

Deployment Switches Functional Width [x-y]

Side 1 mm1.00.100 ”

Side 2 mm1.00.100 ”

Side 3 mm1.00.100 ”

Side 4 mm1.00.100 ” Height [z]

Rail 1 mm1.05.113 ”

Rail 2 mm1.05.113 ”

Rail 3 mm1.05.113 ”

Rail 4 mm1.05.113 ” Diagonal [x-y]

Top 1&3 mm 0

5.12.141 # $

Top 2&4 mm 0

5.12.141 # $

Bottom 1&3 mm 0

5.12.141 # $

Bottom 2&4 mm 0

5.12.141 # $

Authorized By:

IT #1: _____________________ IT #2: _____________________

Testing Info: Date: ______________________ Passed: Y / N

CDS.pdf
cubesat_spec.pdf
cubesat_checklist.pdf

Order from us and get better grades. We are the service you have been looking for.