Design production structure noting quantities for item

Design production structure noting quantities for item/ Operation Management

As the production manager for Sampson Products Inc. You have been given a bil for a bracket that that is made of a base, 2 springs, and 4 clamps. The base is assembled form once clamp and 2 housings. Each clamp has one handle and 1 casting. Each housing has two bearings and 1 shaft. There is no inventory on hand.

  1. Design a production structure noting the quantities for each item and show the low-level coding.
  2. Determine the gross quantities needed of each item if you are to assemble 50 brackets.
  3. Compute the net quantities needed if there are 25 of the bases, and 100 of the clamps in stock.
Order from us and get better grades. We are the service you have been looking for.