Discuss the pros and cons of at most 3 quality systems

Discuss the pros and cons of at most 3 quality systems

Submit the project proposal to your instructor for approval.

Quality Management Integration Plan

Use Word

Title page

Course number and name

Project name

Your name

Date

Table of Contents (TOC)

Use an autogenerated TOC.

This should be on a separate page.

This should be a maximum of 3 levels deep.

Be sure to update the fields of the TOC so that it is up-to-date before submitting your project.

Section Headings (create each heading on a new page with “TBD” as content, except for Week 1)

Plan Quality Management Week 1: Project Outline

Plan Quality Management Week 1: Organizational Readiness for Quality Management

Plan Quality Management Week 1: Quality Systems Analysis

Perform Quality Management Week 2: Quality Dimensions and Criteria

Perform Quality Assurance Week 3: Quality Process Improvement Tools and Techniques

Control Quality Week 4: Quality Performance Monitoring and Control

Control Quality Week 5: Management’s Role in Quality Management

Control Quality Week 5: Quality Performance Communication Plan

prepare the following sections for Week 1:
Project Outline

Include a brief description of the project.
Describe the overall project deliverables.
Material can be taken from the approved proposal that you submitted to the instructor. This may serve as the draft for the proposal.
Be sure that this project is approved by the instructor.
Organizational Readiness for Quality Management

Discuss which quality systems the organization employs today.

Discuss the organization’s readiness to incorporate the selected project.

Include additional support that might be required to incorporate quality management (e.g., a knowledgeable quality champion).

Quality Systems Analysis
Determine the pros and cons of at least 3 quality systems (e.g., ISO 9000, Six Sigma, plan-do-check-act or plan-do-study-act, Capability Maturity Model Integration [CMMI], organizational project management maturity model [OPM3®], Malcolm Baldrige).

Identify which one or combination is most appropriate for this project, and discuss why.

Name the document “LastName_FirstName_MPM357_IP1.doc.”

Order from us and get better grades. We are the service you have been looking for.