Establish power triangle for the total loading on the supply

Establish power triangle for the total loading on the supply

Humanities
The loading of a factory on a 1000-V, 60-Hz system includes: 20-kW heating (unity power factor) 10-kW (Pi) induction motors (0.7 lagging power factor) 5-kW lighting (0.85 lagging power factor)

a. Establish the power triangle for the total loading on the supply.

b. Determine the power-factor capacitor required to raise the power factor to unity.

c. Determine the change in supply current from the uncompensated to the compensated system

Order from us and get better grades. We are the service you have been looking for.