Identify which critical elements should be measured to communicate if the project is on track-Project Evaluation and Control

Identify which critical elements should be measured to communicate if the project is on track-Project Evaluation and Control

A project must be executed effectively and with minimal waste to establish confidence. A plan for performance measurement requires identifying which critical elements should be measured, how they are measured, and when they are measured to communicate if the project is on track.

Write a 2- to 3-page paper on your findings. At a minimum the section will contain the following:

  • Measurable objectives identified as milestones on the Gantt chart
  • Risk mitigation strategy for analyzing and reporting unplanned changes as well what procedures you will plan to implement for handling change control issues
  • Description of project reporting regarding the on-going evaluation and status of project efforts to stakeholder and participants on the project team
  • Method for determining whether the project has met its objectives and how the project is terminated

I will upload previous data when awarded.

Project does not have any attached files

Order from us and get better grades. We are the service you have been looking for.