Plan the testing required for the system

Plan the testing required for the system/ Software Engineering

Background: Susan finished work on system architecture issues, and her system design specifications was approved. Now she is ready to address system implementation tasks, including quality assurance, structure charts, testing, training, data conversion, system changeover, and post-implementation evaluation.

Task 1: Plan the testing required for the system. You should consider unit, integration, and system testing in your test plan and determine who should participate in the testing.

Order from us and get better grades. We are the service you have been looking for.