Will the surveyor have to measure to locate the new station

Will the surveyor have to measure to locate the new station/Civil Engineering

Station 3 + 54.67 must be marked in the field. if the steel tape to be used is only 99.98 under standard conditions and if the temperature is 87 degree farenheit at the time of the measurement, how far away from the existing station mark at 0 + 79.23 will the surveyor have to measure to locate the new station?.

Order from us and get better grades. We are the service you have been looking for.